multiRent — Gestion de copropriétésmultiRent — Gestion de copropriétésmultiRent — Gestion de copropriétésmultiRent — Gestion de copropriétés
  • Services
  • Packages
  • Changing managers
  • Partners
  • Our team
  • Blog
  • Contact
  • Français
Portal
✕
05/09/2026
Categories
  • Operations Management
Tags
  • Board of Directors
  • Common Expenses
  • Electric Vehicle Charger

Measurement Canada and Condo EV Charging Stations: Billing

By Muriel Druart, Client services director

Condominium syndicates of co-owners are facing growing demand for EV charging stations. However, billing for electricity fairly and legally requires compliance with Measurement Canada rules. This article will help you choose a compliant billing model, structure board of directors decisions and incorporate these changes into your day-to-day management.

We cover what Measurement Canada regulates, pricing options based on kWh or time, and the steps for adoption at an AGM. You will also learn how to coordinate installation with an electrical contractor, update the declaration of co-ownership (DCV) as needed and document everything in the minutes. The goal is fair, traceable billing that is compatible with your common expenses and contributions.

Measurement Canada in brief: what applies to your condo

Measurement Canada regulates sales based on a measurement, such as the amount of electricity consumed. In practice, if you bill a co-owner or user for energy by the kilowatt-hour (kWh), the measuring device built into the charging station, or the sub-meter, must be approved and verified according to Measurement Canada requirements. This ensures that the amount billed corresponds correctly to the amount delivered.

Two main situations can arise in a condominium:

  • You “sell” electricity by the kWh to a specific user. In that case, you must use a meter or charging station with approved measurement capabilities and maintain proper records.
  • You recover costs through a mechanism not tied to an energy measurement, such as access fees, occupancy fees or a budget allocation through common expenses. You are not presenting the price as a quantity of electricity, but as a separate service.

The choice of model has technical, legal and financial implications. To remain compliant and transparent, clearly define what you are billing for: energy, time, access or a structured combination. Also ensure that your decisions align with your declaration of co-ownership, building regulations and the majorities required under the Civil Code of Québec (C.C.Q.) (e.g., contributions to common expenses; see section 1064 C.C.Q.).

Compliant billing models for condominium charging stations

Here are the most common approaches, along with their advantages and points to consider for a syndicate:

1) Billing by the kWh using approved measurement

  • For each session, the user pays for the energy consumed by the kWh, measured by a device approved by Measurement Canada.
  • Advantages: the perception of a “fair quantity”; clear and intuitive for co-owners; compatible with several OCPP platforms.
  • Points to consider: certified charging station/meter, calibration and record-keeping; contractual provisions with the charging-station and payment-platform provider; clear communication of rates.

2) Access or occupancy fees (per minute/hour) separate from energy

  • The user pays for use or occupancy of the charging station, for example based on usage time or as an occupancy fee after charging is complete.
  • Advantages: encourages turnover; no direct claim regarding the quantity of energy.
  • Points to consider: do not present these fees as equivalent to a quantity of electricity. If you sell the energy, return to model 1 using approved measurement.

3) Mixed pricing: fixed fee + energy by the kWh

  • A fixed fee covers maintenance, management and part of the common costs, while energy is billed by the kWh using approved measurement.
  • Advantages: budget stability; recovery of maintenance and platform costs.
  • Points to consider: transparency regarding the “service” portion versus the “energy” portion; publication of calculation methods and annual review at the AGM.

4) Recovery through common expenses (without selling energy by the kWh)

  • The syndicate pays for the charging stations’ electricity as a budget item and allocates it among everyone according to their co-ownership shares or a specific regulation provided for in the declaration of co-ownership.
  • Advantages: accounting simplicity; no certified device is required if energy is not billed individually.
  • Points to consider: social acceptance; perceived fairness for non-users; possibility of a specific regulation approved at the AGM to adjust users’ contributions.

Pitfalls to avoid

  • Presenting time-based pricing as an implied substitute for kWh pricing. If the communication suggests a quantity of energy, you risk falling within the scope of Measurement Canada.
  • Using uncertified meters or “smart” charging stations for kWh billing. The display may be convenient for informational purposes, but insufficient for a measured transaction.
  • Overlooking governance: improvised pricing, without a formal resolution or clear minutes, may be challenged by a co-owner.

Syndicate governance: decisions, declaration of co-ownership and transparency

Before installing and billing, confirm consistency with your declaration of co-ownership and building regulations. A charging-station usage policy should specify access, reservations, priorities, occupancy fees, the pricing structure and how outages will be handled. The board of directors leads the project, but certain decisions require the assembly’s approval according to the majority required under the Civil Code.

  • Budgeting and contributions: contributions to common expenses must comply with the Civil Code (see section 1064 C.C.Q.). For differentiated pricing aimed at users, consider a regulation adopted at the AGM and record it in the minutes.
  • Regulations and majorities: depending on the scope (work to the common portions, equipment or financing), specific majorities may apply. Refer to the relevant provisions and, if necessary, consult a legal professional.
  • Documentation: publish the rates and terms on the co-owner portal, attach the policy to the minutes and update the maintenance logbook / EUC if common electrical components are added.

Useful resources:

  • Civil Code of Québec – Contributions to common expenses (see section 1064 C.C.Q.):
    https://www.legisquebec.gouv.qc.ca/fr/document/cs/CCQ-1991?&article=1064
  • General provisions on divided co-ownership (Civil Code page):
    https://www.legisquebec.gouv.qc.ca/fr/document/cs/CCQ-1991
  • Condominium management best practices (RGCQ):
    https://rgcq.org/ressources/

For operational support and policy implementation, see our operations management services: multiRent – Services, operations management. You can also visit our blog for other practical guides.

Technical requirements, safety and electrical capacity

Charging stations and electrical upgrades affect the common portions and have an impact on the building’s capacity. Hire an electrical contractor who holds the appropriate licence and complies with the regulations in force. A capacity study, demand-management devices and, in some cases, an upgrade to the electrical service will be required.

  • RBQ compliance and safety: ensure that the charging station, wiring and protection are installed in accordance with applicable standards. Compliance and periodic maintenance must be incorporated into your maintenance plan.
  • Demand management: shared controllers limit the load to avoid costly peaks and protect your infrastructure.
  • Integration with the building: specify what falls under the common portions (main supply and panels) and the private portions (parking space and branch circuits). This distinction guides costs and responsibilities.

Recommended technical resources:

  • RBQ – Information on charging stations and electrical work:
    https://www.rbq.gouv.qc.ca/
  • RBQ – Role and obligations of electrical contractors:
    https://www.rbq.gouv.qc.ca/licence-entrepreneur/

Remember to add the charging station and related power supply to your maintenance logbook / EUC, with inspection intervals and archived proof of maintenance. The contingency fund should also reflect, where necessary, future replacements of common components.

Implementation, taxation and ongoing management

From the first quote to the first invoice, structure your project in clear stages:

  1. Analysis and planning
    • Map co-owner needs, electrical capacity and locations permitted by the declaration of co-ownership.
    • Choose a compliant billing model (certified kWh, access/time, mixed or common expenses).
  2. Decision-making and rules
    • Draft a usage policy, set the rates and have a resolution adopted at the AGM if necessary. Record all decisions in the minutes.
  3. Purchase and installation
    • Select charging stations compatible with your model (approved measurement, OCPP and demand control). Entrust installation to a qualified contractor.
  4. Operations and monitoring
    • Test the payment platform, configure user profiles and define the reports required for auditing and board information.
  5. Billing and taxes
    • Depending on the scenario, taxes (GST/QST) may apply to the supply of electricity or service fees. Check the taxation, billing, tax-number and remittance rules.

Tax and administrative resources:

  • Revenu Québec – Sales taxes (GST/QST) for businesses:
    https://www.revenuquebec.ca/fr/entreprises/taxes/
  • RGCQ – Governance tools and condominium templates:
    https://rgcq.org/ressources/

Practical example: in a condominium under our management, the board opted for mixed pricing. A fixed monthly fee covers the platform and maintenance; energy is billed by the kWh through charging stations with approved measurement. The rates, dispute procedure and occupancy policy are published internally, and monthly statements are provided to the board for monitoring.

Need help with implementation and operations? See our packages and our financial and administrative management support.

FAQ – Measurement Canada and condominium charging stations

Q1. Can we bill by time instead of by the kWh?

Yes, if you clearly bill for access or occupancy without representing a quantity of electricity. If you bill for the quantity of energy, use measurement approved by Measurement Canada and retain the required records.

Q2. Is an uncertified “smart” charging station sufficient for billing for energy?

No. “Informational” displays do not replace approved measurement when electricity is sold by the kWh. Choose an approved charging station or sub-meter if you bill for energy.

Q3. Who pays for maintenance and how should it be budgeted?

Depending on the policy adopted, part of it may be covered by access fees, user contributions or common expenses. Include maintenance in the annual budget and, if necessary, in the contingency fund for common components.

This article provides general information and does not constitute legal advice. Consult a lawyer or notary for your situation.

This article provides general information and does not replace advice from a tax professional or accountant. Refer to Revenu Québec and the CRA for exact details.

Do you manage a condominium in Quebec? Discover our packages or contact us to assess your needs.

Managing your condo building with multiRent

  • Condo management services
  • Condo maintenance logbook
  • Condo management pricing

Areas served: South Shore · Montreal · Laval · Longueuil · Brossard · Boucherville · Saint-Constant · Saint-Amable · Saint-Jérôme

Share

Related posts

04/11/2026

Concierge or Outsourced Maintenance in a Co-ownership


Read more
21/10/2026

Mice and Rats in a Co-ownership: Who Pays?


Read more
06/10/2026

Condo Renovation Security Deposits in Quebec


Read more

Comments are closed.

multiRent — Gestion de copropriétés

Services

Administrative management

Financial management

Operations management

Portal

About Us

The multiRent team

Contact us

Notaries

LinkedIn

RGCQCorporate member of the RGCQ

Resources

RGCQ

CORPIQ

Portal
    Manage Consent

    To give you the best possible experience, we use technologies such as cookies to store and/or access information about your device. Consenting to these technologies lets us process data such as browsing behaviour or unique identifiers on this site. Declining or withdrawing your consent may affect certain features.

    Functional Always active
    Technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
    Preferences
    The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
    Statistics
    The technical storage or access that is used exclusively for statistical purposes. Technical storage or access used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your internet service provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
    Marketing
    Technical storage or access is required to create user profiles in order to send advertising, or to track the user across a website or several websites for similar marketing purposes.
    • Manage options
    • Manage services
    • Manage {vendor_count} vendors
    • Read more about these purposes
    Manage preferences
    • {title}
    • {title}
    • {title}