multiRent — Gestion de copropriétésmultiRent — Gestion de copropriétésmultiRent — Gestion de copropriétésmultiRent — Gestion de copropriétés
  • Services
  • Packages
  • Changing managers
  • Partners
  • Our team
  • Blog
  • Contact
  • Français
Portal
✕
16/09/2026
Categories
  • Financial Management
Tags
  • Budget
  • Common Expenses
  • Financial Statements

Hydro-Québec power factor in a co-ownership: penalties and corrective measures

By Muriel Druart, Client services director

Power factor directly affects the electricity bill of a divided co-ownership. In many buildings, a poor power factor results in additional charges, sometimes identified as “penalties” on the Hydro-Québec business bill. For a board of directors (the board), understanding this mechanism can help reduce common expenses and improve budget planning.

This article explains, in plain language, how power factor works, why additional costs are incurred, how to diagnose the situation in your building, and which corrective measures to apply without compromising compliance or safety.

Understanding power factor for a syndicate of co-owners

Power factor (PF) measures how efficiently a building converts the electricity it receives into useful work. It ranges from 0 to 1. The closer it is to 1, the more efficiently energy is used. A low PF is often caused by inductive equipment: elevator motors, fans, garage pumps, compressors, lighting with ballasts, and so on.

In practice, a low PF requires the grid to provide more apparent power for the same active power. As a result, the distributor may charge additional fees associated with reactive power consumption. These amounts are added to condo fees through common expenses.

In Québec, the syndicate, a legal person made up of the co-owners (C.C.Q. reference), administers and preserves the building and assumes the energy expenses for the common portions. It may therefore be worthwhile to incorporate PF optimization into the maintenance logbook (EUC) and work planning.

  • Common portions typically affected: ventilation, heating and air conditioning in common spaces, corridor and parking-area lighting, and elevators.
  • Private portions: consumption in the units has little effect on the PF of the common meter, unless common expenses are measured through these meters.

For the board, a controlled PF means fewer recurring expenses to be allocated in accordance with the declaration of co-ownership and the budget approved at the AGM.

How Hydro-Québec bills for and applies penalties

Business-rate bills may include components related to measured power and reactive energy. When the power factor is below a threshold determined by the applicable rate, additional charges may appear. They are not a “fine” in the legal sense, but rather a pricing mechanism intended to reflect less efficient use of the grid.

On your bill, you may see:

  • References to kVARh (reactive energy) or power in kVA;
  • A power factor expressed as a percentage;
  • An additional-fee line attributable to an insufficient PF.

The exact details depend on the business rate in effect and your building’s consumption profile. The board should monitor monthly trends, especially after equipment is added (e.g., charging stations, new pumps or fans) or major renovations are completed.

With respect to its financial and administrative responsibilities, the Civil Code of Québec provides that the syndicate administers the building, preserves the common portions and establishes a contingency fund for major repairs (see the C.C.Q. provisions relating to the syndicate and the fund). This does not require a specific technical corrective measure, but it does call for prudent management of energy expenses and investments that reduce them.

  • C.C.Q. reference: Civil Code of Québec – Syndicate of Co-owners

Diagnosing a poor power factor in your building

Before purchasing equipment, validate the actual situation. A proper diagnosis prevents you from oversizing a solution or overlooking other measures.

Indicators on your bill

  • Average PF below the applicable rate target: a priority sign that optimization is needed.
  • Seasonal variations: a peak in inductive loads in summer (cooling) or winter (pumps and ventilation).
  • An increase in kVARh after common equipment is added (e.g., garage ventilation or improperly configured charging stations).

Other practical steps:

  • Record the information on motor nameplates (HP/kW, voltage and service factors) to create an inventory of inductive loads.
  • Review the operating sequence for equipment (BMS), schedules and simultaneous starts.
  • Temporarily install a power-quality analyser to measure kW, kVAR, kVA and harmonics.

Governance tip: present a short report to the board that includes charts, assumptions and potential savings. File the document as an appendix to the board meeting minutes to ensure follow-up and traceability.

Technical corrective measures: capacitor banks and optimization

The most common corrective measures combine the addition of reactive capacity with load optimization.

Choosing the equipment

  • Fixed capacitor bank: useful for a relatively constant load (e.g., continuously operating pumps). Simple, economical and not very complex.
  • Automatic (stepped) capacitor bank: adjusts compensation according to demand. Appropriate when loads vary (elevators and cycling ventilation).
  • Variable-frequency drives (VFDs): optimize motor speed, reduce kW and sometimes improve the apparent PF. Excellent for fans and pumps.
  • Operational optimization: stagger equipment schedules, avoid simultaneous starts and verify phase balancing.

Maintenance and RBQ compliance

Any electrical work in common portions must comply with safety rules and be performed by a contractor holding the appropriate licence. Regular maintenance prevents overheating, premature aging and PF drift.

  • Check the ventilation and cleanliness of electrical cabinets.
  • Include the inspection of capacitor banks and VFDs in the maintenance logbook (EUC).
  • Require “as-built” drawings and operating instructions for the maintenance team.

Useful resources:

  • RBQ – Electricity and licences: rbq.gouv.qc.ca
  • Good co-ownership management practices: rgcq.org

Summary comparison of solutions

Solution Ideal context Complexity Potential impact on expenses
Fixed capacitors Stable load (pumps) Low Moderate to high, depending on the PF deficit
Automatic capacitors Variable load (elevators, HVAC) Medium High if properly sized
VFDs on motors Oversized ventilation systems or pumps Medium to high Energy savings + improved PF
Schedule/sequence optimization Multiple common motors Low Quick, low-cost gains

Sizing must take harmonics into account. In some cases, “filtered” capacitors (with a series reactor) are required to prevent resonance.

Financial impacts and governance: budget, the board and the AGM

Financially, the objective is twofold: reduce recurring electricity expenses and ensure that the investment is justified by the anticipated savings. The board should incorporate the cost-benefit analysis into the annual budget and then present its recommendations to the AGM.

Good practices:

  • Document the current situation (bills and measurements) and the financial analysis.
  • Verify compliance with the declaration of co-ownership and, if necessary, update the building regulations concerning access to electrical rooms and maintenance.
  • Record the decision in the AGM minutes, along with the budget allocation and work schedule.

The contingency fund is used for major repairs and replacements of common portions. Some energy-efficiency measures may instead be budgeted as operating expenses or through a fund dedicated to routine maintenance. Ask your manager and accountant for advice on presenting these items accurately in the financial statements.

As for taxes, electricity supplied for common portions is generally taxable. Verify the GST/QST treatment applicable to the syndicate and the proper accounting for input tax credits.

  • Revenu Québec – Supply of energy (GST/QST): revenuequebec.ca
  • C.C.Q. – Provisions concerning syndicate administration and expenses: LégisQuébec

For an overview of other condo financial management topics, see our financial management services and explore the multiRent blog for additional practical guides.

FAQ – power factor in a co-ownership

  • Can the board install capacitors without an AGM vote? Often, this is maintenance or optimization work involving common portions. Depending on your declaration of co-ownership and the scope of the project, a vote may be required. Confirm with the manager and, if necessary, obtain an AGM resolution.
  • How can we determine whether the investment will be worthwhile? Compare the projected savings on the reactive and/or power component, the overall PF improvement, and the acquisition and maintenance costs. A test lasting several weeks with a power-quality analyser can help make the assumptions more reliable.
  • Do charging stations negatively affect power factor? They can influence the load profile if power management is not optimized. A charging sequence, power limits and monitoring of kVA can mitigate the effect.

References and additional resources:

  • RBQ – Electricity: rbq.gouv.qc.ca
  • RGCQ – Resources for syndicates: rgcq.org
  • LégisQuébec – Civil Code of Québec (syndicate, expenses and fund): legisquebec.gouv.qc.ca
  • Revenu Québec – Energy supply and taxes: revenuequebec.ca

This article provides general information and does not constitute legal advice. Consult a lawyer or notary for advice regarding your situation.

This article provides general information and is not a substitute for advice from a tax specialist or accountant. Refer to Revenu Québec and the CRA for the exact rules.

Do you manage a co-ownership in Québec? Discover our packages or contact us to assess your needs.

Managing your condo building with multiRent

  • How much a condo manager costs
  • Condo manager
  • Condo management pricing

Areas served: South Shore · Montreal · Laval · Longueuil · Brossard · Boucherville · Saint-Constant · Saint-Amable · Saint-Jérôme

Share

Related posts

18/11/2026

Condo Accounting: Property Manager or Accountant?


Read more
09/11/2026

Manager-Affiliated Suppliers: Hidden Fees


Read more
19/10/2026

Uninhabitable Unit: Do Condo Fees Still Have to Be Paid?


Read more

Comments are closed.

multiRent — Gestion de copropriétés

Services

Administrative management

Financial management

Operations management

Portal

About Us

The multiRent team

Contact us

Notaries

LinkedIn

RGCQCorporate member of the RGCQ

Resources

RGCQ

CORPIQ

Portal
    Manage Consent

    To give you the best possible experience, we use technologies such as cookies to store and/or access information about your device. Consenting to these technologies lets us process data such as browsing behaviour or unique identifiers on this site. Declining or withdrawing your consent may affect certain features.

    Functional Always active
    Technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
    Preferences
    The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
    Statistics
    The technical storage or access that is used exclusively for statistical purposes. Technical storage or access used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your internet service provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
    Marketing
    Technical storage or access is required to create user profiles in order to send advertising, or to track the user across a website or several websites for similar marketing purposes.
    • Manage options
    • Manage services
    • Manage {vendor_count} vendors
    • Read more about these purposes
    Manage preferences
    • {title}
    • {title}
    • {title}