multiRent — Gestion de copropriétésmultiRent — Gestion de copropriétésmultiRent — Gestion de copropriétésmultiRent — Gestion de copropriétés
  • Services
  • Packages
  • Changing managers
  • Partners
  • Our team
  • Blog
  • Contact
  • Français
Portal
✕
12/09/2026
Categories
  • Financial Management
Tags
  • Common Expenses
  • Electric Vehicle Charger
  • Quebec

Electricity Rates for EV Charging Stations in Condos in Quebec: D, DT or G?

By Muriel Druart, Client services director

Transportation electrification is accelerating, and more and more syndicates are installing charging stations in the common portions. In divided co-ownerships, the choice of electricity rate and cost-rebilling method directly affects common expenses, cash flow and fairness among co-owners.

This article will help you compare rates D, DT and G, understand their practical impact on your budget, and implement a cost-allocation method that complies with your declaration of co-ownership and sound management practices. (Updated September 12, 2026.)

  • Are you unsure whether to connect the charging stations to the common portions meter or to individual meters?
  • Are you concerned about an increase in common expenses during the winter peak period?
  • Does your board of directors want user billing that is easy to administer and traceable in the minutes?

Let’s look at how to make the right choice efficiently, without surprises at the AGM.

Rates D, DT and G: what syndicates need to know

Before installing or connecting charging stations, the board of directors must confirm the rate framework that will apply to the meter in question.

  • Rate D (residential): Generally associated with residential use. When a charging station is powered by a condo’s private-portion meter, consumption is usually billed under this rate. This simplifies rebilling: each co-owner pays for their own electricity.
  • Rate G (general): Often applies to common portions meters, since this is not private residential use. If the charging stations are connected to the common portions meter, electricity may be billed at rate G, affecting common expenses and power management.
  • Rate DT (dual-energy): Designed for dual-energy installations (electricity combined with another heating source). Electricity costs less outside periods of extreme cold but become considerably more expensive during winter peaks. If a building already uses DT for heating, connecting charging stations to it requires a clear policy to avoid high costs at the wrong times.

In practice, the rate is not something the syndicate can simply choose: it depends on the actual use, equipment and meter involved. The board must confirm that the desired service is eligible and anticipate how the bill will be affected by the season and charging schedule. For the general legal framework governing energy rates, refer to the Act respecting the Régie de l’énergie (LégisQuébec).

Rate Typical condo context Points for the board to consider
D Charging station connected to a private-portion meter (unit) Simple user billing; electrical capacity of the unit’s panel; authorizations for passing through common portions
G Charging station(s) on the common portions meter Cost allocation; management of power and charging times; fairness between users and non-users
DT Dual-energy building (heating) Higher costs during periods of extreme cold; strict usage policy; automated load shedding recommended

Legal reminder: Each co-owner contributes to common expenses according to their share of the common portions, unless the declaration of co-ownership provides otherwise (see section 1064 C.C.Q., LégisQuébec). When charging energy runs through the common portions meter, the board must establish a rebilling or allocation method that complies with the building’s regulations.

Useful sources:

  • LégisQuébec – Civil Code of Québec, section 1064 (contributions to common expenses)
  • LégisQuébec – Act respecting the Régie de l’énergie
  • RBQ – Electric vehicle charging stations (safety and compliance)
  • RGCQ – Resources on condo charging stations

Choosing the right connection and rate for your building

The right choice depends on your electrical configuration, declaration of co-ownership and fairness objectives.

  1. Charging stations on private-portion meters (rate D)
    • Advantages: Each co-owner pays for their consumption; reduced administrative work; no direct impact on common expenses.
    • Challenges: Unit electrical capacity may be limited; work in the common portions; technical coordination and rights of passage.
    • Plan for: Clauses in the building regulations covering installation, maintenance, access and restoration of the common portions.
  2. Charging stations on the common portions meter (often rate G)
    • Advantages: Shared infrastructure; greater flexibility for energy and load-shedding management; scalable for multiple users.
    • Challenges: A precise rebilling mechanism for users (or internal pricing) is needed to avoid making non-users pay; rigorous monitoring by the board.
    • Plan for: A measurement system for each station (submeters, “smart” charging stations), a charging-hours policy and rules governing access to parking spaces.
  3. Dual-energy building (rate DT)
    • With DT, electricity becomes very expensive during periods of extreme cold. Charging a vehicle at those times can cause the common bill to skyrocket.
    • Without automated load shedding, it is difficult to maintain usage discipline. Opt for managed charging stations that block or limit charging during peak periods.
    • The board must clearly communicate the policy to co-owners and record decisions in the minutes, after approval at the AGM if necessary.

Governance tip: Document your options in a brief technical report, attach it to the AGM notice of meeting and record the decision in the minutes. This strengthens transparency and limits disputes.

Cost allocation: fairness, the declaration of co-ownership and tracking tools

Without a clear framework, charging stations in the common portions create frustration. Three common approaches are:

  • Usage-based rebilling: The syndicate bills users for energy and, where applicable, a share of maintenance costs. This requires meters or charging stations that measure kWh per user.
  • Targeted surcharges: An additional contribution from users for infrastructure amortization, separate from regular common expenses.
  • Full integration into common expenses: Rarely fair if not everyone charges; avoid this unless the declaration of co-ownership expressly provides for it or the AGM clearly ratifies it.

Best practices for the board:

  • Confirm compatibility with the declaration of co-ownership and building regulations.
  • Specify the management rules for the affected spaces and common portions (wiring, technical rooms and parking spaces).
  • Keep an audit trail: energy reports, internal billing and proof of payment; append them to the minutes at year-end.
  • Consider the maintenance logbook to plan maintenance and future electrical-capacity upgrades.

To reduce the impact on condo fees, adopt a simple principle: the user pays for their consumption, while the community finances only the minimum shared infrastructure needed to provide access, based on an informed AGM decision.

Reducing the bill: demand management, schedules and power

Regardless of the rate applicable to the meter, how charging is managed has a major impact on the bill.

  • Smart load shedding: Distribute available power among charging stations to smooth demand and avoid peaks.
  • Off-peak hours: Schedule charging overnight and outside winter peak periods. With DT, block charging during expensive periods.
  • Moderate power: A 7.2 kW charging station does not always need to operate at full capacity. Reducing the amperage extends charging time but lowers peak demand.
  • Usage rules: Time windows, priority for regular users and internal penalties for non-compliance (if provided for in the building regulations).
  • Monthly monitoring: Provide the board with a simple report on kWh, peaks and costs so the policy can be adjusted quickly.

Also consider phased upgrades: start with a few managed charging stations, assess the financial impact and then expand. This approach protects the syndicate’s budget and avoids an excessive increase in contributions.

Implementation and compliance: steps for the board

The technical and legal aspects should not be improvised.

  • Electrical study: Service capacity, clearances, technical spaces, cable routes, ventilation and fire protection.
  • Qualified professionals: Work performed by a master electrician; compliance with RBQ requirements and applicable standards.
  • Internal authorizations: Board resolutions and, if there is a significant modification to the common portions, AGM approval in accordance with the majority rules set out in the declaration of co-ownership and the C.C.Q.
  • Insurance: Notify your insurer and take inspection and maintenance requirements into account.
  • Building regulations: Specify access to the charging stations, billing, internal penalties and responsibilities in the event of damage.

For example, one syndicate we assist chose “smart” charging stations on the common portions meter, with automated billing to users. The result: stable common expenses and clear reports appended to the annual minutes.

For more information on budget planning, see our financial and operational management service pages:

  • Services – Financial management (budgets, rebilling)
  • Services – Operations management (technical projects, compliance)

You will also find other useful articles in our blog index: https://www.multirent.ca/blog/

FAQ – Charging stations and condo electricity rates

Q1. Can we freely “choose” D, DT or G for charging stations?
– No. The rate depends on the type of service and the use of the meter (private residential use versus common portions, dual energy, etc.). The board must confirm that the targeted meter is eligible and adjust the usage policy accordingly.

Q2. Is installing a dedicated meter for each parking space realistic?
– Technically, yes, but it can be costly and complex. Smart charging stations with user-level measurement and automated rebilling often offer a better cost-benefit ratio while avoiding the need for multiple meters.

Q3. How can we prevent non-users from paying for charging-station energy?
– Implement usage-based rebilling based on reliable measurements (kWh/station/user) and adopt a clear board resolution, ideally ratified at the AGM. Keep the documentation in the minutes and apply the rules consistently.


External sources mentioned:

  • LégisQuébec – Civil Code of Québec, section 1064
  • LégisQuébec – Act respecting the Régie de l’énergie
  • RBQ – Electric vehicle charging stations
  • RGCQ – Condo charging stations

Useful internal links:

  • multiRent packages
  • Our services
  • Contact us

This article provides general information and does not constitute legal advice. Consult a lawyer or notary regarding your situation.

This article provides general information and does not replace advice from a tax professional or accountant. Refer to Revenu Québec and the CRA for the exact rules.

Do you manage a condo in Quebec? Explore our packages or contact us to assess your needs.

Managing your condo building with multiRent

  • How much a condo manager costs
  • Condo manager
  • Condo management pricing

Areas served: South Shore · Montreal · Laval · Longueuil · Brossard · Boucherville · Saint-Constant · Saint-Amable · Saint-Jérôme

Share

Related posts

18/11/2026

Condo Accounting: Property Manager or Accountant?


Read more
09/11/2026

Manager-Affiliated Suppliers: Hidden Fees


Read more
19/10/2026

Uninhabitable Unit: Do Condo Fees Still Have to Be Paid?


Read more

Comments are closed.

multiRent — Gestion de copropriétés

Services

Administrative management

Financial management

Operations management

Portal

About Us

The multiRent team

Contact us

Notaries

LinkedIn

RGCQCorporate member of the RGCQ

Resources

RGCQ

CORPIQ

Portal
    Manage Consent

    To give you the best possible experience, we use technologies such as cookies to store and/or access information about your device. Consenting to these technologies lets us process data such as browsing behaviour or unique identifiers on this site. Declining or withdrawing your consent may affect certain features.

    Functional Always active
    Technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
    Preferences
    The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
    Statistics
    The technical storage or access that is used exclusively for statistical purposes. Technical storage or access used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your internet service provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
    Marketing
    Technical storage or access is required to create user profiles in order to send advertising, or to track the user across a website or several websites for similar marketing purposes.
    • Manage options
    • Manage services
    • Manage {vendor_count} vendors
    • Read more about these purposes
    Manage preferences
    • {title}
    • {title}
    • {title}