multiRent — Gestion de copropriétésmultiRent — Gestion de copropriétésmultiRent — Gestion de copropriétésmultiRent — Gestion de copropriétés
  • Services
  • Packages
  • Changing managers
  • Partners
  • Our team
  • Blog
  • Contact
  • Français
Portal
✕
31/08/2026
Categories
  • Financial Management
Tags
  • Board of Directors
  • Electric Vehicle Charger
  • Quebec

Quebec 2026 Condo EV Charger Grant

By Muriel Druart, Client services director

Installing EV chargers in divided co-ownership raises questions about funding, eligibility and governance. Here is a practical guide to identifying and maximizing every Quebec 2026 condo EV charger grant, while meeting your syndicate and board of directors (the board) obligations. (Information current as of August 31, 2026.)

Why plan your chargers in 2026

Transportation electrification is accelerating. In a co-ownership, deploying chargers requires more structured financial, technical and legal planning than in a single-family home. Grants and incentives in 2026 can reduce the cost of individual chargers in private portions and common infrastructure (cabling, panels and “backbone” systems), but they come with specific criteria.

  • Demand is growing: many co-owners want to charge at home, and the board must establish rules for access, electricity billing and fairness between users and non-users.
  • The work often affects common portions (electrical supply, cable routes and fire protection), which means appropriate authorizations, votes and documentation (minutes) are required.
  • A well-managed grant reduces common expenses in the short term and supports condo values over the medium term, provided the project is compliant and traceable.

Programs and incentives to check

Each program has its own rules (eligible beneficiary, charger type, installation location, reimbursed percentage and deadlines). In 2026, always check the following:

  • Provincial programs targeting charging in multi-unit residential buildings. Some cover common infrastructure (pre-wiring and distribution), while others cover an individual co-owner’s charger. Amounts and categories change; consult the government’s official pages for current criteria.
  • Potential municipal measures (e.g., technical support, parking and urban planning) that may require permits or provide additional assistance.
  • The tax treatment of assistance (grants received by the syndicate versus the co-owner). Refer to Revenu Québec to understand the tax implications based on your status and the nature of the assistance.
  • Installation requirements: the contractor must hold the appropriate licence, and electrical work must comply with applicable standards.

Useful references:

  • Civil rules applicable to co-ownership decisions and work (see C.C.Q.): LégisQuébec
  • Electrical contractor licence and work compliance: RBQ – Electrical Contractor
  • Best practices and governance in co-ownership: RGCQ
  • Measures and tax credits (subject to eligibility): Revenu Québec – Tax Credits

Eligibility and requirements in a divided co-ownership

Before applying for financial assistance, confirm legal and documentary compliance:

  • Declaration of co-ownership and building bylaws: check the clauses concerning work, EV chargers and the use of common portions and private portions. An amendment or internal “right-to-charge” policy is often necessary to establish rules for requests, wait lists and cost sharing.
  • Authorizations and votes: depending on the scope of work affecting common portions (e.g., adding electrical capacity, cable routes and protective devices), a vote at the AGM or a special meeting may be required (see sections 1097 and 1098 C.C.Q.). The quorum, majority and resolutions must be recorded in the minutes.
  • Expense allocation: common expenses and contributions must comply with section 1064 C.C.Q. and the co-ownership shares schedule. For user-specific costs (individual charger and energy management), a rebilling mechanism may be established, ideally supported by meters or usage measurements.
  • Insurance and liability: inform the syndicate’s insurer. Certain upgrades (detectors, circuit breakers, fire extinguishers and signage) may be required to maintain coverage.
  • Maintenance logbook / EUC: update the logbook and the maintenance logbook study to incorporate the new infrastructure (service life, inspections and replacements) and its impact on the contingency fund.

Your board’s seven-step process

  1. Establish needs and scenarios
    Assess interest (survey co-owners), possible locations and current electrical capacity. Document current and potential users over the next 5–10 years to avoid undersizing.

  2. Verify legal compliance
    Review the declaration of co-ownership, bylaws and charger installation policy. Prepare a draft resolution and, if necessary, a bylaw amendment to submit to the AGM.

  3. Technical study and preliminary budget
    Engage a professional (an electrician holding the appropriate licence) to conduct a preliminary study covering available capacity, solutions (load management, dedicated panels and shared chargers) and project phasing. Prepare a budget separating common infrastructure from individual equipment.

  4. Identify grants and incentives
    Identify applicable components (infrastructure versus individual chargers, syndicate versus co-owner). Note deadlines, maximum amounts, supporting documents and pre-project requirements (quotes, photos, plans and proof of meeting approval).

  5. Assembly approval and record-keeping
    Present the scenarios at a meeting (AGM or special meeting). Obtain the required vote and record the decisions in the minutes. Attach the documentation (reports, quotes and schedule) to the syndicate’s records.

  6. Select contractors and complete the work
    Request comparable bids. Require proof of RBQ licence, insurance and compliance with standards. Plan site access, site safety and commissioning tests.

  7. Reporting and follow-up
    Submit reimbursement applications by the deadlines, with all required documents (resolutions, detailed invoices, “before and after” photos and certificates). Update the maintenance logbook/EUC and communicate the results to co-owners.

Management tip: for the financial side (budgets, supporting documents and controls), see how a tool-based approach can simplify reporting. Visit our Services – Financial Management page and compare pricing adapted to your syndicate’s size.

Budget, cost sharing and impact on condo fees

A clear budget distinguishes between:

  • Studies and engineering (electrical capacity, charging architecture and testing)
  • Common-portion infrastructure (power supply, cable trays, protective devices and signage)
  • Individual chargers (equipment, cabling to the private location or dedicated use)
  • Energy management and measurement solutions (“smart” chargers, power limits and metering)
  • Maintenance and upgrades (periodic inspections and planned replacements)

Key points for the board:

  • Contingency fund: common infrastructure must be incorporated into the contingency fund, with realistic replacement horizons. This avoids unexpected special contributions later.
  • Cost allocation: common expenses follow the co-ownership shares schedule, but user-specific costs (e.g., a private charger and electricity consumed) should be rebilled fairly through a clear policy.
  • Grants received: apply them to the appropriate item (a reduction in infrastructure costs or reimbursement to the eligible co-owner) and explain their effect on the annual budget and common expenses.
  • Communication: share the schedule, project phasing and impacts on parking spaces in advance. An FAQ sheet attached to the minutes reassures co-owners.

For an overview of best practices in co-ownership, follow our publications on the multiRent blog.

Quick 2026 FAQ

Is assembly approval required to install chargers?

For most projects involving common portions, yes. Depending on the scope, a regular or enhanced majority may apply (see sections 1097–1098 C.C.Q.). Keep the resolutions in the minutes and attach the plans and bids.

Can a co-owner require a charger in their space?

The right to install a charger is recognized subject to compliance with the declaration of co-ownership, safety rules and the terms governing access to common portions. The board may impose reasonable conditions (power supply method, metering and insurance) to protect the building and ensure fairness.

Who pays for electricity and maintenance?

Electricity associated with a private charger should be measured and rebilled to the user. Maintenance of common equipment follows the rules applicable to common portions; condo fees may include a portion for maintenance, while users pay for additional usage as needed.

What proof should you keep for a grant?

Usually: meeting resolution, signed quotes, proof of RBQ licence, “before and after” photos, detailed invoices, compliance diagrams and commissioning certificate. Carefully follow the list required by the program.


This article provides general information and does not constitute legal advice. Consult a lawyer or notary for your situation.

This article provides general information and does not replace advice from a tax specialist or accountant. Refer to Revenu Québec and the CRA for the exact rules.

Do you manage a co-ownership in Quebec? Discover our packages or contact us to assess your needs.

Managing your condo building with multiRent

  • How much a condo manager costs
  • Condo manager

Areas served: South Shore · Montreal · Laval · Longueuil · Brossard · Boucherville · Saint-Constant · Saint-Amable · Saint-Jérôme

Share

Related posts

18/11/2026

Condo Accounting: Property Manager or Accountant?


Read more
09/11/2026

Manager-Affiliated Suppliers: Hidden Fees


Read more
19/10/2026

Uninhabitable Unit: Do Condo Fees Still Have to Be Paid?


Read more

Comments are closed.

multiRent — Gestion de copropriétés

Services

Administrative management

Financial management

Operations management

Portal

About Us

The multiRent team

Contact us

Notaries

LinkedIn

RGCQCorporate member of the RGCQ

Resources

RGCQ

CORPIQ

Portal
    Manage Consent

    To give you the best possible experience, we use technologies such as cookies to store and/or access information about your device. Consenting to these technologies lets us process data such as browsing behaviour or unique identifiers on this site. Declining or withdrawing your consent may affect certain features.

    Functional Always active
    Technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
    Preferences
    The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
    Statistics
    The technical storage or access that is used exclusively for statistical purposes. Technical storage or access used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your internet service provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
    Marketing
    Technical storage or access is required to create user profiles in order to send advertising, or to track the user across a website or several websites for similar marketing purposes.
    • Manage options
    • Manage services
    • Manage {vendor_count} vendors
    • Read more about these purposes
    Manage preferences
    • {title}
    • {title}
    • {title}