Equivalent NBCP Measure in Quebec: Variance for Condominiums

By Muriel Druart, Client services director

Updated September 20, 2026

In a divided co-ownership, fire safety requirements under the NBCP (National Building Code of Canada—National Fire Code) apply on a daily basis: evacuation routes, alarm systems, compartmentation, signage and maintenance. However, some existing buildings cannot always comply with the Code to the letter for technical or architectural reasons. In such cases, it may be possible to obtain an “equivalent measure”—commonly called a variance—in order to achieve a comparable level of safety by other means.

This article explains when and how to submit an application for an equivalent NBCP measure, what evidence to provide, who makes the decision, and how the board of directors (the board) should manage the file with the property manager and qualified professionals. It also includes useful links to the RBQ and LégisQuébec, sample content templates and governance advice tailored to Quebec syndicates of co-owners.

Useful SEO tip for your search: your “equivalent NBCP measure Quebec condominium variance” file must demonstrate a level of safety at least equivalent to the original rule and provide for the ongoing maintenance of the proposed devices.

Equivalent NBCP Measure: Definition, Legal Basis and Competent Authority

  • Definition: an equivalent measure consists of replacing a specific NBCP requirement with a different solution that provides an equivalent or higher level of fire safety.
  • Legal basis: the Building Act (B-1.1) and its regulations allow different or equivalent measures to be applied, subject to the conditions and approvals of the competent authority (see the RBQ and the references in the Safety Code of Québec, chapter B-1.1, r. 3). Refer to the official texts on LégisQuébec and the RBQ’s directives.
  • Competent authority: for NBCP operating requirements, the authority with jurisdiction is generally the municipal fire safety service (e.g., city/agglomeration). In some files, or when the scope affects the Building Code, the RBQ may become involved. Always confirm with your local fire department.

Sources to consult:
RBQ – Different or equivalent measures
RBQ – NBCP in Quebec (overview and application)
LégisQuébec – Building Act (B-1.1)
LégisQuébec – Safety Code, chapter B-1.1, r. 3

When to Consider a Variance in a Condominium

  • The NBCP requirement is technically impossible to implement without altering the structure, heritage features or essential elements of the common portions.
  • The required work would be disproportionate to the risk, while another combination of measures would provide a comparable level of safety.
  • The building was constructed under an earlier regime, and certain original conditions cannot be changed without major impacts on the private portions.
  • The standard regulatory solution would compromise universal accessibility or functionality, while a compensatory approach is possible (additional detection, improved fire doors, strict control of combustible loads, etc.).

Important: an equivalent measure is not “permission to be non-compliant.” It requires a rigorous demonstration that the level of fire safety will be maintained (or improved). The authority may impose conditions, periodic inspections, testing, and maintenance recorded in the maintenance logbook/EUC.

Step-by-Step Process for Obtaining an Equivalent Measure

  1. Define the requirement to be replaced
    Identify the specific NBCP article and the building’s actual situation (plans, photographs, maintenance reports, inspection reports). Document the constraints affecting the common portions and the impact on the private portions.
  2. Retain a qualified professional
    Retain a fire safety engineer or specialized firm. Depending on the complexity, an architect, technologist or building mechanical engineer may contribute. Request NBCP references and professional liability insurance.
  3. Design the equivalent solution
    Develop compensatory measures: enhanced detection/alarm systems, targeted compartmentation, automatic closing, door control, improved emergency lighting, optimized signage and evacuation plans, strict control of combustible materials, operating procedures and staff training.
    Prepare calculations (evacuation routes, visibility in smoke), a risk summary and, where necessary, modelling (realistic fire scenarios).
  4. Assemble the technical file
    Include: a signed engineering report, plans and specifications, technical data sheets, a maintenance and verification program, operating instructions, training materials, register forms and a “requirement → solution → evidence → responsibility” matrix.
    Specify the location (levels, stairwells, mechanical rooms), firefighter access and interoperability with existing systems.
  5. Submit the application to the competent authority
    Use the forms required by your fire department/municipality or the RBQ, attach the applicable fees and propose an implementation schedule.
    Plan for technical meetings and, if necessary, a site visit.
  6. Respond to comments and obtain approval
    The authority may request clarifications, additional testing or adjustments. A letter of acceptance or a formal order/notice will specify the conditions, scope, duration and maintenance/inspection obligations.
  7. Implement, train and record
    Install the equipment, update the signage and evacuation plans, and train the responsible people (management, caretaker and board members). Record verifications in the NBCP register and the maintenance logbook/EUC.
  8. Archive and communicate
    Keep the approval with the DCV, the building’s by-laws and the testing register. Inform co-owners (newsletter, board meeting minutes, presentation at the AGM). Post instructions where required.

Competent Authority and Scope

  • Operations/maintenance (NBCP): generally the municipal fire department.
  • Construction or alteration work (Building Code): municipality (permit) and, where necessary, the RBQ.

Time Frames and Validity

Time frames vary depending on the complexity and the authorities’ workload. Allow several weeks to several months, especially if testing or modelling is required. Some approvals specify a duration or maintenance conditions: comply with them and renew them as needed.

Expected Technical Evidence and Examples of Solutions

Here are some typical examples. Your technical team will determine the best combination for your building.

  • Detection and alarm solutions: adding addressable detectors, strengthening audible/visual notification appliances and creating area-specific alarm scenarios.
  • Smoke control and compartmentation: fire doors with door closers, compliant seals and smoke gaskets, and firestopping of penetrations.
  • Evacuation: additional emergency lighting, pictograms, photoluminescent marking, multilingual instructions and drills.
  • Operational management: storage policies, verification rounds, annual training and hot-work procedures.

Examples of evidence to attach:

  • Calculations of travel distances and evacuation flow rates.
  • Test reports (alarm activation, measured evacuation time and door closing).
  • Periodic inspection forms (applicable NFPA/CSA standards) and certificates from qualified companies.
  • As-built plans, functional diagrams and alarm scenarios.

Summary table (illustrative examples):

Targeted NBCP requirement Possible equivalent measure Typical evidence
Visibility and guidance during evacuation Photoluminescent marking + supplemental lighting Engineering report, lighting-level tests
Existing limited compartmentation Automatic fire doors + firestopping Certificates, closing tests, photographs
Insufficient detector density Addressable network with increased coverage Diagrams, alarm tests, commissioning reports

Governance advice: add the new maintenance and verification tasks to the maintenance logbook/EUC and budget recurring inspections as common expenses. Some interventions may fall under routine operations; others may require a board vote and information at the AGM for transparency. Keep the decisions in the minutes.

Roles of the Board, Property Manager and Co-Owners

  • Board of directors (the board): leads the decision to retain experts, approves submission of the application, oversees compliance and communication with the authorities. It ensures budget follow-up and keeps the documents in the syndicate’s records.
  • Property manager/coordination: schedules visits, consolidates the documents (quotes, certificates and attestations), keeps the NBCP register up to date and maintains the maintenance logbook/EUC.
  • Co-owners: follow the instructions (e.g., no storage in evacuation routes), attend drills, report deficiencies and vote on budgets at the AGM when necessary.

Additional best practices:

  • Update the DCV (or its technical appendices) and the building’s by-laws if permanent instructions are required.
  • Include a maintenance clause in your service contracts and track schedules with an annual reminder.
  • When a private portion is sold, the broker and buyer may request compliance confirmations or copies of notices from authorities. Transparency reduces transaction risks.

Budget, Risks and Insurance

  • Professional costs: engineering fees, possible modelling, testing, plans and specifications. Avoid under-documenting the file: a solid file saves time when communicating with the authority.
  • Implementation costs: equipment, signage, doors and electrical devices. Plan these amounts in your common expenses and multi-year maintenance plan.
  • Contingency fund: generally intended for major replacements of common portions. Depending on the nature of the work, part of it may be charged to the operating budget; confirm with your accountant and property manager.
  • Syndicate insurance: inform your insurer of modifications made to safety systems and keep the certificates. Proactive management can reduce certain loss risks.

Useful resources:
RBQ – Different or equivalent measures
RGCQ – Fire safety best practices in condominiums
LégisQuébec – Building Act

For structured operational support, see our operations management services and all our services. Our blog contains other practical guides for your syndicate.

FAQ – Equivalent NBCP Measures in Condominiums

  • Who approves the equivalent measure?
    For NBCP operations, it is generally the municipal fire safety service. If the solution affects construction, municipal permits and, in some cases, the RBQ may also be involved.
  • Can the building be operated while waiting for approval?
    You must remain compliant with the requirements in force. If a risk is identified, the authority may require temporary measures. Avoid any unapproved modification that would reduce safety.
  • Is the variance permanent?
    Not necessarily. The authority may limit its duration, require inspections and reserve the right to revoke it if the conditions are not met. Keep your records up to date and renew it as needed.
  • What is the difference between a “different measure” and an “equivalent measure”?
    Both aim to achieve the Code’s objectives by other means. In practice, the authority assesses whether the proposed solution provides a level of safety equal to or higher than the targeted rule and whether its maintenance is guaranteed.

This article provides general information and does not constitute legal advice. Consult a lawyer or notary for your situation.

Do you manage a condominium in Quebec? Discover our packages or contact us to assess your needs.

Managing your condo building with multiRent

  • Condo maintenance logbook
  • Condo management pricing

Areas served: South Shore · Montreal · Laval · Longueuil · Brossard · Boucherville · Saint-Constant · Saint-Amable · Saint-Jérôme

Share

Related posts

04/11/2026

Concierge or Outsourced Maintenance in a Co-ownership


Read more
21/10/2026

Mice and Rats in a Co-ownership: Who Pays?


Read more
06/10/2026

Condo Renovation Security Deposits in Quebec


Read more

Comments are closed.

multiRent — Gestion de copropriétés

Services

Administrative management

Financial management

Operations management

Portal

About Us

The multiRent team

Contact us

Notaries

LinkedIn

RGCQCorporate member of the RGCQ

Resources

RGCQ

CORPIQ

Portal
    Manage Consent

    To give you the best possible experience, we use technologies such as cookies to store and/or access information about your device. Consenting to these technologies lets us process data such as browsing behaviour or unique identifiers on this site. Declining or withdrawing your consent may affect certain features.

    Functional Always active
    Technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
    Preferences
    The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
    Statistics
    The technical storage or access that is used exclusively for statistical purposes. Technical storage or access used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your internet service provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
    Marketing
    Technical storage or access is required to create user profiles in order to send advertising, or to track the user across a website or several websites for similar marketing purposes.
    • Manage options
    • Manage services
    • Manage {vendor_count} vendors
    • Read more about these purposes
    Manage preferences
    • {title}
    • {title}
    • {title}