Number of Buildings per Property Manager
How many co-ownerships can one person manage effectively? The answer matters to every board of directors that wants to assess its manager’s actual availability. However, the number of buildings per property manager reveals only part of the workload.
A portfolio of ten small divided co-ownerships may require less work than three complex high-rises. The number of units, equipment, conflicts and level of service completely change the calculation. The board must therefore assess the actual workload rather than look for a universal ratio.
Is There a Maximum Number of Buildings per Property Manager?
No Quebec rule sets a maximum number of co-ownerships or units per property manager. A figure presented without context is therefore a commercial indicator, not a legal or professional standard.
The Civil Code of Québec assigns the syndicate responsibility for preserving the building and administering the common portions (see section 1039 C.C.Q.). The board of directors administers the affairs of the syndicate, while day-to-day administration may be entrusted to a manager (see sections 1084 and 1085 C.C.Q.). These rules can be consulted in the Civil Code of Québec.
Hiring a manager does not relieve the board of its oversight role. Directors should verify whether the portfolio allows the manager to comply with the contract, the declaration of co-ownership and the decisions recorded in the minutes.
A firm may sometimes manage more buildings than an independent property manager thanks to shared resources. An administrative team, structured accounting and planned replacement reduce reliance on a single person. This difference is explored further in our comparison of an independent property manager and a management firm.
What Factors Determine Actual Capacity?
The first factor is the total number of units. Thirty six-unit buildings do not represent the same reality as thirty buildings with one hundred units. The more co-owners there are, the more communications, payments and requests increase.
The physical configuration also matters. A building with elevators, a garage, a pool, mechanical systems and several access points requires more follow-up. The maintenance logbook and contingency fund study may also generate several interventions that need to be scheduled.
The condition of the building directly affects the workload. A recent, well-documented co-ownership generally requires less catch-up work than a building with deferred work. Insurance claims, deficiencies and special assessments can keep the manager occupied for several weeks.
The level of service provided for in the contract is equally important. Limited financial management does not involve the same responsibilities as full management. Financial, administrative and operational management services should be distinguished before comparing two portfolios.
Lastly, the syndicate’s governance can make the mandate easier or more demanding. An organized board that communicates clear decisions allows matters to be handled more quickly. Conversely, conflicting directions and delayed approvals slow down every file.
How Can You Measure a Property Manager’s Workload?
The board can request a factual description of the portfolio without requiring confidential information. The number of buildings, number of units and responsibilities assumed are generally enough to begin the analysis.
The following table presents the elements to examine. No criterion should be interpreted in isolation.
| Dimension | Question to Ask | Warning Sign |
|---|---|---|
| Portfolio | How many buildings and units are assigned to the manager? | Rapid increase without additional resources |
| Complexity | What equipment and major projects are being monitored? | Several major projects underway at the same time |
| Support | Which tasks are centralized or delegated? | One person handles every file |
| Availability | What response time is provided for in the contract? | Recurring delays without explanation |
| Continuity | Who takes over during an absence? | No replacement identified |
| Emergencies | How are urgent calls triaged? | Unclear procedure or reliance on a personal cellphone |
A simple method is to compare the available hours with predictable tasks. This should include board meetings, the AGM, budgets, calls for tenders and follow-up on condo fees. Document requests, inspections and emergencies must also be considered.
The calculation must account for peak periods. Budget preparation, insurance renewals and construction projects are not always spread out evenly. A portfolio may seem reasonable on average but become difficult to service when several deadlines coincide.
The manager should also explain the prioritization system. A request involving safety or an insurance claim cannot be handled like a general question. Digital tools can make follow-up easier, but they do not replace judgment or human resources.
What Questions Should You Ask Before Signing or Renewing?
The board should obtain precise answers about how the service is organized. A promise of high availability has little value without a process, target response time or person responsible.
Here are useful questions to include in the assessment:
- How many units are currently assigned to the lead property manager?
- Is this portfolio expected to grow during the term of the contract?
- Who prepares the budgets, internal financial statements and assessment notices?
- Who organizes the meetings, the AGM and the preparation of the minutes?
- Who provides replacement coverage during holidays or an extended absence?
- How are co-owner requests recorded and prioritized?
- What frequency of visits to the common portions is included?
- Who coordinates contractors and verifies documentation follow-up?
When work requires a licensed contractor, the syndicate can consult the RBQ licence verification service. The manager coordinates the parties involved, but specialized work must be entrusted to the appropriate companies.
The board should also compare the contractual scope, exclusions and responsibilities of the syndicate. Our guide on questions to ask before signing provides a basis for structuring this process. The Regroupement des gestionnaires et copropriétaires du Québec also provides information on co-ownership governance practices.
What Signs Indicate an Overloaded Portfolio?
An occasional delay does not necessarily demonstrate an overloaded portfolio. A major emergency or AGM period may temporarily affect response times. The board should instead look for recurring, documented problems.
The most revealing signs include emails that regularly go unanswered, forgotten follow-ups and incomplete documents. Budgets sent late or board decisions that are not implemented also warrant verification. Constantly reactive management may indicate that preventive tasks are being postponed.
The board can keep a simple record of requests, deadlines and responses received. This approach helps distinguish a general impression from a measurable problem. It also facilitates a constructive discussion with the manager.
Before concluding that the portfolio is overloaded, it is necessary to determine whether the blockage comes from the manager, the board or a supplier. A late approval, lack of funds or unclear instructions may slow down the file. Responsibility is sometimes shared.
If the gaps persist, the syndicate can request a corrective plan with responsibilities and realistic deadlines. It can also review the level of service or the organization of the portfolio. The right ratio is the one that allows the mandate to be carried out consistently, without sacrificing compliance, communication or preventive maintenance.
This article provides general information and does not constitute legal advice. Consult a lawyer or notary for advice regarding your situation.
Do you manage a co-ownership in Quebec? View our rates or contact us to assess your needs.
